Education

Learning institutions take on various forms, and widely range in the complexity of MEP service needs. Our experience includes complex technical colleges and medical learning environments, to special education needs, each deserving of individual mechanical and commissioning requirements.

The mechanical demands of the modern school building are significantly greater than the school houses of the past, so great attention to detail is required to ensure they are commissioned to perform efficiently and effectively.
Our Completed Projects
City, University of London
University Campus - Validation / Commissioning
Airtech Premier were appointed to undertake an in depth validation of recently completed electrical and mechanical installations to establish the operation of installed equipment and re-commission these services in line with the design intent.
The Marjory Kinnon / Gresham Road
Sen Schools - Pre-commissioning / Commissioning
Airtech Premier were instructed to carry out pre-commissioning and the subsequent commissioning of these two projects, assisting the contractor to obtain BREEAM level ‘Excellent’ through seasonal commissioning.
The Francis Crick Institute
Laser Scope Room - Validation / Commissioning
Our engineers carried out validations of ventilation and hydraulic services to carry out alterations to a recently completed system to increase capacity of the cooling arrangements associated with sensitive scientific equipment.