Commercial

We are all aware of the fast paced nature of the commercial sector, which is always evolving with the latest trends and developments, and ultimately growth and development of business. Airtech Premier are always at the cutting edge of these developments assisting clients in the most effective ways of utilising existing installations, trouble shooting problems to configuring systems for maximum efficiency and performance.

With an established track record, from small start up companies to big blue chip companies, we take the time to fully understand the clients requirements and provide cost effective solutions to suit their requirements.
Our Completed Projects
Kenwood / De Longhi
Head Office Validation / Commissioning
Airtech Premier were appointed to undertake an in depth validation of recently completed electrical and mechanical installations to establish the operation of installed equipment and re-commission these services in line with the design intent.
First Central 200, Park Royal
Validation / Pre-commissioning / Commissioning
Investigations into a loss of environmental control were carried out through extensive performance testing and water sampling. Once the defects had been identified, rigorous water treatment activities were performed and the air and water systems re-balanced.
Hurley Palmer Flatt
The Ark, Hammersmith
Our engineers carried out validations of ventilation and hydraulic services to advise the consulting engineers of available capacity of the existing systems for an expansion project.